 |
 |
 |
| Full-length view of the left
slider and pivot latch with the playfield all the way down in playing
position. |
Here the playfield is raised and
its grab rails are resting on the top edge of the front of the cabinet
(service position). |
First step of the pivot latch
sequence. Playfield is being pulled out in preparation for upright
position. |
| |
|
|
 |
 |
 |
| Playfield pulled out a little
more... |
Playfield pulled out as far as
it will go, ready to lift up. |
Starting to lift it to upright.
This causes the latch to pivot and trap the rear bolt post. |
| |
|
|
 |
 |
|
| Here it is about halfway up... |
Full upright position. |
|